Learn about the ongoing Public Works and Facilities repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.
Cochran Boulevard at Veterans Boulevard Intersection Improvments
Last Updated: 01/23/2025 Category: Roadway Current Phase: Construction
The design and construction of new turn lanes and traffic signal modifications at Cochran Boulevard and Veterans Boulevard intersection.
Last Updated: 01/23/2025 Category: Sidewalks Current Phase: Planning and Project Approval
Gulf Cove SidewalksRampart Blvd. Sidewalk phase 3
Last Updated: 01/23/2025 Category: Sidewalks Current Phase: Design Development
Rampart Blvd. Sidewalk phase 3Last Updated: 01/22/2025 Category: County Facilities Category: Sales Tax Funded Current Phase: Planning and Project Approval
Construction of a new 4 stall apparatus bay Fire Station on the NW corner of Tamiami Trail & Green Gulf Blvd at the Tuckers Grade intersection in Punta Gorda.Last Updated: 01/22/2025 Category: County Facilities Category: Sales Tax Funded Current Phase: Planning and Project Approval
Construct a new fire station at a location to be determinded, replacing the old fire station. New fire station will generally conform to a new prototype design for new and replacement stations. Includes land acquisition for station to be located nearby present location.Last Updated: 01/22/2025 Category: County Facilities Category: Sales Tax Funded Current Phase: Planning and Project Approval
Construct a new Fire Station at a location to be determinded, replacing the old fire station. Includes land acquisition for station to be located nearby present location.Placida West Boat Ramp Expansion
Last Updated: 01/22/2025 Category: Parks And Recreation Category: Sales Tax Funded Current Phase: Design Development
A 2014 Tier 2 Sales Tax project. The Placida Boat Ramp West Expansion project develops the property adjacent to the existing boat ramp to add features including a new two-lane boat ramp, kayak launch, restroom, and parking.Charlotte Harbor CRA - Melbourne Street multi-use path
Last Updated: 01/21/2025 Category: Sidewalks Current Phase: Design Development
Construct pedestrian sidewalk on Melbourne Street from U.S. 41 to Harborview Road.
Charlotte Harbor CRA - Parmely Street road widening and sidewalk
Last Updated: 01/21/2025 Category: Roadway Current Phase: Design Development
Reconstruct and widen Parmely Street from U.S. 41 to Bayshore Road.
Construct multi-use path on Parmely Street from U.S. 41 to Bayshore Road.